Client: SEPA - South Eastern Program Alliance

Timeline: May 2023

Union Mont Albert Station

Client

SEPA – South Eastern Program Alliance

Services Provided

  • Design co-ordination
  • Electrical reticulation
  • Lighting installation
  • Power installation
  • Lighting control
  • Exit & emergency control
  • Test and commission

Location

Mont Albert, Victoria

Scope of Works

Electrical Works for the New Mont Albert Station to:-

  • Station buildings.
  • Elevated Platforms including Platform Canopies.
  • Staircases, Ramps, Bridge and Supplies to two Lifts.
  • Major Carpark, In ground services and lighting.
  • Shared User Path and general paths lighting.

Specific electrical scope included supply and installation of:-

  • LV main switchboard.
  • Technical earthing system to equipotential Zones.
  • Isolation Transformers.
  • Sub distribution boards.
  • Generator System.
  • LV mains, submains, final sub-circuit and control cabling.
  • Lighting control equipment.
  • Electrical metering equipment.
  • Emergency lighting control and monitoring equipment.
  • Electrical and communication cable trays and support brackets.
  • Electrical above ground conduit and wiring systems.
  • Light switches, socket outlets and isolators.
  • Luminaires and associated accessories and mounting brackets.
  • Luminaires and Pole coordination to ensure aesthetics are maintained.
  • Emergency luminaires and exit signs.
  • Testing and commissioning.

Recent Infrastructure Projects