Client: DOWNER
Timeline: 9 months
Waurn Ponds Stabling Yard
Client
DOWNER
Services Provided
- Design co-ordination
- Survey
- Site wide excavation
- Electrical reticulation
- Ocs reticulation
- Csr reticulation
- Piling pole foundations
- Directional drilling
- Lighting installation
- Power installation
- test and commission
Location
Bogans Lane, Mount Duneed, Victoria, 3217
Scope of Works
Electrical Works for the Waurn Ponds Stabling Yard to:-
- Main Switchboard, Metering Pillar and consumers mains
- Temporary Generator connection point and associated cable reticulation
- Main Distribution Board, Power Factor Correction unit, DB Stabling Yard 1, DB Stabling Yard 2, DB Stabling Yard Stabling Yard 3, DB Stabling Yard 4, DB Stabling Yard 5 and associated cable reticulation.
- Light Poles/CCTV Poles and associated luminaires. Catenary Poles, Catenary mounted luminaires including catenary wires and mountings. Power pedestals, general power, and associated cable reticulation.
- Power for Fire Services
- Power for Diesel fuel pumps
- Power for other disciplines as nominated on the drawings, Hydraulic services, gate isolators and DB fuel.
- Trenching, conduit, pit installation and backfill as nominated on the drawings to facilitate the above electrical installation and future provisions.
- Testing, commissioning and certification
- Operation & Maintenance Manual
Fast Facts
- 1250 TON of rock exported from excavation
- 7450 TON imported backfill material
- 31,500 meters of conduit installed
- 276 PITS installed
- 76 m3 Concrete poured for piles
- 111 LIGHT/CCTV/CATENERY pole foundations
- 43,000 meters of cable installed