Client: DOWNER

Timeline: 9 months

Waurn Ponds Stabling Yard

Client

DOWNER

Services Provided

  • Design co-ordination
  • Survey
  • Site wide excavation
  • Electrical reticulation
  • Ocs reticulation
  • Csr reticulation
  • Piling pole foundations
  • Directional drilling
  • Lighting installation
  • Power installation
  • test and commission

Location

Bogans Lane, Mount Duneed, Victoria, 3217

Scope of Works

Electrical Works for the Waurn Ponds Stabling Yard to:-

  • Main Switchboard, Metering Pillar and consumers mains
  • Temporary Generator connection point and associated cable reticulation
  • Main Distribution Board, Power Factor Correction unit, DB Stabling Yard 1, DB Stabling Yard 2, DB Stabling Yard Stabling Yard 3, DB Stabling Yard 4, DB Stabling Yard 5 and associated cable reticulation.
  • Light Poles/CCTV Poles and associated luminaires. Catenary Poles, Catenary mounted luminaires including catenary wires and mountings. Power pedestals, general power, and associated cable reticulation.
  • Power for Fire Services
  • Power for Diesel fuel pumps
  • Power for other disciplines as nominated on the drawings, Hydraulic services, gate isolators and DB fuel.
  • Trenching, conduit, pit installation and backfill as nominated on the drawings to facilitate the above electrical installation and future provisions.
  • Testing, commissioning and certification
  • Operation & Maintenance Manual

Fast Facts

  • 1250 TON of rock exported from excavation
  • 7450 TON imported backfill material
  • 31,500 meters of conduit installed
  • 276 PITS installed
  • 76 m3 Concrete poured for piles
  • 111 LIGHT/CCTV/CATENERY pole foundations
  • 43,000 meters of cable installed