Client: John Holland – North West Program Alliance

Timeline: 15 months - Completed August 2021

New Coburg and Moreland Stations – Level Crossing Removal

Client

John Holland – North West Program Alliance

Services Provided

  • Design co-ordination
  • Electrical reticulation
  • Lighting installation
  • Power installation
  • Lighting contol
  • Exit & emergency control
  • Test and commission

Location

Coburg, Victoria

Scope of Works

Electrical Works for the New Coburg and Moreland Stations to:

  • Station buildings
  • Elevated Platforms including Platform Canopies.
  • Staircases, Ramps, Bridge and Supplies to two Lifts.
  • Carpark, Inground services and lighting
  • Shared User Path and general paths lighting.

Specific electrical scope included supply and installation of:

  • LV main switchboard and main earthing system.
  • Isolation Transformers.
  • Sub distribution boards.
  • Generator System.
  • LV mains, submains, final sub-circuit and control cabling.
  • Lighting control equipment.
  • Electrical metering equipment.
  • Emergency lighting control and monitoring equipment.
  • Electrical and communication platform Junction Cabinets.
  • Electrical and communication cable trays and support brackets.
  • Electrical above ground conduit and wiring systems.
  • Light switches, socket outlets and isolators.
  • Luminaires and associated accessories and mounting brackets.
  • Emergency luminaires and exit signs.
  • Testing and commissioning.

Fast Facts

  • Design collaboration at concept stage
  • First of Only of combined Platform Cabinets
  • Works carried out during Covid Pandemic

Gallery

Recent Infrastructure Projects

  • January 11, 2023

    Infrastructure

  • January 11, 2023

    Infrastructure